Details: construction of bridge excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) levelling course for pile capproviding and laying of pcc m15 (using batching plant & concrete pump) levelling course 100mm thick below the pile cap. cement concrete for reinforced concrete (rcc grade m30 using batching plant & cncrete pump) in pile cap complete as per drawing and technical specification supplying, fiiting and placing un-coated hysd bar reinforcement in foundation complete as per drawing and technical specifications. bored cast-in-situ m35 grade rcc pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000m. (pile diameter - 1200mm). providing steel liner 6mm thic
Sector: RDPR