Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area.s.o.r. item no. 2.02 construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2.s.o.r. item no. 3.18metres. by mechanaical means using hydraulic excavator. s.o.r. item no. 3.15(i) construction of embankment with material deposited from roadway cutting. (construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.)s.o.r. item no. 3.17 construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the d
Sector: RDPR