Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area. compacting original ground supporting sub grade (loosening of the ground upto a level of 500mm below the sub-grade level ,watered ,graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction.)s.o.r. item no. 3.20 case-i construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m construction of embankment with material deposited from roadway cutting (construction
Sector: RDPR