Details: providing site cleaence flank filling leveling and dressing in road providing granular sub base such as stone dust filling in uniform layer in road providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:1½:3 (1 cement: 1½ coarse sand (zone-iii) :3 graded stone aggregate 20 mm nominal size earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 m and lift of 1.5 m all complete as per building specification and direction of e/i. (mode of measurement compacted volume) add. carriage cost of materials (1) cement lead from 5 km (2) sand lead from 50 km (3) stone chips lead from 12 km (4) stone dust lead from 12 km providing site cleaence flank filling leveling and dressing in road providing granular sub base such as stone dust filling i
Sector: Zilla Parishad