Details: i) strengthening of road from chandil dam road(mukhiya hotel) to diyadih via borabinda (length:5.50k.m.), clearing grass and removal of up to a distance of 50 metres outside the periphery of the area.s.o.r. item no. 2.02 construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2.s.o.r. item no. 3.18 excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 ms.o.r. item no. 3.06 construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surfac
Sector: RDPR