Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area s.o.r. part - a item no. 2.02 excavation in soil by manual means. (excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.)s.o.r. item no. 3.01 providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 40 mm nominal size) construction of embankment with material deposited from roadway cutting (construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.) rate per after adding royalty @rs 27.48/ .o.r. item no. 3.17 (ii) providing and laying in position coment concrete
Sector: Zilla Parishad