Details: excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) i) ordinary soil (excavation upto 3.0m depth) levelling course (pcc m15) for pile cap cement concrete for reinforced concrete m-25 in pile cap complete as per drawing and technical specification supplying, fiiting and placing un-coated hysd bar reinforcement in foundation complete as per drawing and technical specifications. plain/reinforced cement concrete (rcc grade m25) in substructure complete as per drawing and technical specifications. supplying, fiiting and placing hysd bar reinforcement in sub-structure complete as per drawing and technical specification. providing weep holes in brick masonry/plain/reinforced concrete abutment, wing wall/return all with 100 mm dia ac pipe, extendin
Sector: RDPR