Details: clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per technical specification clause 201.s.o.r. item no. 2.02 compacing original ground supporing subgrade (loosening of the ground upto a level of 500 mm below the subgrade level, watered graded and compected in layers tomeet requirement of tables 300.2 for subgread construction as per technical specifications.o.r. item no. 3.20 case i construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with 1000m lead as per technical specification clause 303.1s.o.r. item no. 3.18 construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compactin
Sector: RDPR