Details: earth work in excavation in foundation trenches in ordinary soil(vide classification of soil item-a) and disposal of excaveted earth as obtained to a distance upto 50m including all lifts levelling,ramming the foundation trenches, removing roots of trees,shrubs all complete as per approved design,building specification and direction of e/i./incharge providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of e/l. providing and laying of dry rubble fiooring complete as per drawing and technical specification clause 1303.3 providing p.c.c m-150 with nominal mix of (1:2:4) in foundation with approved quality of stone metal grade iii ( 4 graded stone aggregate 20 mm nominal size) clean coarse sand of f.m 2.5 to 3 including
Sector: District Administration