Details: earth work in excavation of foundation of foundation trenches as per design section in ordinary or soft rock and disposal of excavated materials so obtained (50 m away from the edge of trenches ) with initial lead of 150 m and initial lift of 1.5 m as per specification and direction of e/i. providing coarse clean sand filling in foundation trenches or in plinth, including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royality and taxes all complete as per building specification and direction of e/i ( mode of measurement compacted volume). supplying and laying(property as per design and drawing) rip rap with good quality of boulders duly packed including the cost of materials, royality all taxes etc. but excluding the cost of carriage all complete as per specification and direction of e/i. providing and laying p.c.c or r.c.c . m-150 with nominal mix of (1:2:4 ) in foundation of various componets of canal or e
Sector: Water Resource Department