Details: earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item -a) and disposal of excavated earth as obtained to a distance up to 50 m including all lifts , levelling , ramming the foundation trenches , removing roots of trees , shrubs all compete as per approved design , building specification and direction of e/i. extra for earth work in hard soil as per specification and direction of e/i (vide classification of soil item b) filling in foundation trenches and plenth in layers not exceeding 150 mm. thick well watered , rammed ,fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50m and lift in 1.5m all complete as per building specification and direction of e/i (mode of measurment compacted volume ) providing coarse clean sand in filling or in plinth including ramming
Sector: RDPR