Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area by manual means excavation in soil using hydraulic excavator and tippers with disposal upto 1000 metres. excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m construction of embankment with material deposited from roadway cutting. construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.rate per after adding royalty@rs 27.48/ construction of subgrade and earthen shoulders construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with approved material obtained from borrow p
Sector: RDPR