Details: (i) japla chhattarpur p.w.d road to gadurahi via mohmdabad (l-4.500 km.)clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per technical specification clause 201 construction of subgrade and earthen shoulders (construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2) granular sub-base with coarse graded material (table:- 400- 1)construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.with grading-i material providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with w
Sector: RDPR