Details: removal of unserviceable soil including excavation loading and disposal upto 1000 m lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in-charge providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of e/i (mode of measurement compacted volume) providing and laying 80mm thick factory made cement concrete interlocking paver block of m-40 grade made by block making machine with strong vibratory compaction of approved size, d
Sector: Urban Authority