Details: granular sub-base with close graded material ( table:- 400- 2) (construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) all complete job as per direction of e/i.rate per for grading- v material. wet mix macadam (plant mix method) providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. providing and applying primer coat with ss1 grade bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying prime
Sector: Road development