Details: dismantling r.c.c. work including stacking serviceable materials in countable stacks within 15m. lead and disposal of unserviceable materials with all leads all complete as per direction of e/i. dismantling patent stone floor including stacking serviceable materials in countable stacks within 15m. lead and disposal of unserviceable materials with all leads all complete as per direction of e/i. dismantling old plaster and pointing in cement or lime and raking out joints to 15mm depth, watering and disposal of unserviceable materials with all leads all complete as per direction of e/i. providing 40mm thick r.c.c. (1:1.5:3) jacketing (vertical r.c.c. covering) on either side of brick wall with 12mm & down graded stone chips and approved quality of sand of f.m. 2.5 to 3.0 excluding the cost of reinforcement, including shuttering, centering, royalty and all other taxes complete job as per specification and direction of e/i. (analysis approved vide t.e.c. letter no. 435 dt. 28.02.89) providi
Sector: Human Resources