Details: earth work in excavation in foundation trenches in ordinary soil and disposal of excavated earth as obtained to a distance up to 50.0m ,including all lifts, levelling ,ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design ,building specification and direction of e/i(vide classification of soil item -b) providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials ,labour ,royalty and taxes all complete as per building specification and direction of e/i(mode of measurement compacted volume) providing designation 75 a one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of e/i providing nominal mix pcc m-150 of (1:2:4) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coars
Sector: Zilla Parishad