Details: (special repair of road from dorma pwd road to khijurtoli) scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. by mechanaical means using motor grader clearing grass and removal of up to a distance of 50 metres outside the periphery of the area by manual means excavation in soil using hydraulic excavator and tippers with disposal upto 1000 metres. excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m construction of embankment with material deposited from roadway cutting. construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement
Sector: RDPR