Details: jungle clearance in borrow area,building premises,flanks and slopes on the road,canals and embankment by removing the grass and the jungle bushes from the top including weeding out shrubs including roots and levelling etc. complete as per direction of e/i.(specification revised in meeting of regional co-ordinators held on 11.01.84 in the office of t.e.c.) (vide item no.5.1.3.1 of wrd part-b, pg no.-97) / common part-a page no.-195 sl. no.- 2.02 earth work in excavation of foundation trenches of toe wall,spillway,head regulator, outlet, intake well etc. as per designed section in all kinds of soil including moorum soil, soil mixed with kankar, pebbles and boulders upto 300mm size and disposal of the same (beyond 50 m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5 m as per specification and direction of e/l.(vide item no. - 5.1.14.1 of wrd part -b ,pg no.-99) earth work in excavation of foundation trenches of toe wall, spillway, head regulator, int
Sector: Water Resource Department