Details: earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-a) and disposal of excavated earth as obtained to a distance upto 50 m. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of e/l. extra for earthwork in hard soil as per specification and direction of e/i. ( vide classification of soil item-b) filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50m and lift of 1.5m all complete as per building specification and direction of e/i. (mode of measurement compacted volume) filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50m and lift of 1.5m
Sector: Buildings