Details: earth work in excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 25 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil extra for every add. lift of 1.5 m beyond providing and laying of dry random rubble masonary with nallaha stones in foundation with out bond stones incl. carriage from at an avg lead of 15kms from sourc p/fixing of cement concrete ring (.84m dia and .15 m ht) incl. all leads and lifts complete job providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size steel reinforcement for rcc work incl. cutting ,bending,placing in position and binding complete upto plint level. 5.22.6 tmtbars of gradefe500 d or more const of brick masonary chamber for undergro
Sector: RDPR