Details: earth work in excavation by manual means in trenches for foundations,drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, includingdressing of sides and ramming of bottoms lift upto 1.5 m, including gettingout excavated earth and disposal of surplus excavated earth as directed all kinds of soil : extra lift for every additional lift of 1.5m rr m asonary with hard stone in foundation and plinth including levevling uo with cement concrete with 1:6:12 mix in 1:6 mix cemne mortar dry rr masonary with hard stones in foundation and plitnh with bond stones (quarry) providing and laying in position of specified grade of reinforced cement concrete in 1:1.5:3 mix including curing excluding cost of centering and shuttering providing and fixing ms steel reinforcement including cutting bending and placining in position cenetreing and shuttering including strutting propping etc and removal of same constructing brick maso
Sector: RDPR