Details: engagement of earth excavator 75 h.p for removal of slips and drain clearance and disposal of same out side the peripheri of areas cleared by engaging tracotr/trolly wherever required (all inclusive including pol) as per the direction of engineer - in charge.(lmr) supplying, sorting and spreading of (river bed material) r.b.m. as per instructions of the engineer-in-charge including all leads and lifts carriage of material by m.t. (complete job). (lmr). hand-packing stones in wire-crates including cost of crates and stones carriage of material by mechanical transport including loading / unloading and stacking at site complete. stones / boulders for an average lead of 5.00 km.
Sector: PWD