Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth to the disposal site or as directed by the i/c engineer. providing and laying in position cement concrete of specified grade including curing, centring and shuttering. all work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all carriages complete job. providing and laying in position cement concrete of specified grade including curing, centring and shuttering. all work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including all carriages complete job. brick work with common burnt clay (non-modular) bricks of class designati
Sector: Industry Development