Description: Construction of Bridal Path for the Tunder Village Right Bank Side and Sounder PMGSY Road Left Bank Side from Newly Constructed Foot Suspension Bridge at U s Side of Dam of Pakal Dul HE Project CVPPPL Kishtwar JnK Name of Work Construction of Bridal Path for the Tunder Village Right Bank Side Sounder PMGSY Road Left Bank Side from Newly Constructed Foot Suspension Bridge at U s Side of Dam of Pakal Dul HE Project CVPPPL Kishtwar J K
Details: Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock. Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone.
Sector: Generation