Description: Construction of prepaid counters at chandanwari Name of Work Construction of prepaid counters at chandanwari Advt Cost 15 22 inclusive of all applicable taxes with 18 GST
Details: Name of Work: Construction of prepaid counters at chandanwari Advt.Cost=₹ 15.22 ( inclusive of all applicable taxes with 18% GST)Item Description2Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Ordinary RockProviding and laying of stone soling/boulders duly hand packed on bed of trenches including all carriages and headload involved up to site of work completeProviding and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shutteri
Sector: PWD