Details: earth work in excavation by manual means in trenches for foundations, drains, pipes etc. (not exceeding 1.5m in width) and for shafts,wells, cesspits and the ;like not exceeding 10sqm on plan, oincluding dressingof sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of surplus excavated earth directed by eic in all kinds of soils providing and laying of dry stone soling duly hand packed in foundation trenches including ramming spreading etc including all leads and lifts with carriages providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering . all work upto plinth level with:1:4:8 (1 cement : 4 coarse sand :8 graded stone aggregate 20 mm nominal size) random rubble stone masonary with hard stones in foundations and plinth including levelling up with cement concrete in 1:6:12 (1 cement: 6 coarse sand: graded stone aggregate) in cement mortar 1:6 mix prov
Sector: RDPR