Details: demolishing cement concrete manually/by mechanical means having 1:3:6 or richer mix (i/c equivalent design mix) including disposal of material within 50 meters lead as per direction of engineer-in charge: dismentalling of old reinforced cement concrete slab manually including stacking of bars and disposal of debris upto lead upto 50 mtrs complete in all respects extra for cutting reinforcement bars manually/by mechanical means in r.c.c. or r.b. work (payment shall be made on the cross sectional areas of r.c.c. or r.b. work) as per direction of engineer-in-charge. extra for scrapping, cleaning and straightening reinforcement from r.c.c. or r.b. work earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. - all kinds of soil : extra for every additional lift of 1.5 m or part thereo
Sector: General Admin