Details: earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge.all kinds of soil earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge.all kinds of soil : supplying and filling stone dust including dressing complete. providing, laying, water bound macadam, with broken nallah stone aggregate of 63mm to 45mm size andbinding material including screening of 13.2mm sizeand stone dust; sorting spreading to template and consolidation with power road roller of 8-10 ton capacity complete sub base course,grade -ii( single) providing, laying, water bound macadam, with broken nallah stone aggregate of 53 to 22.40 mm si
Sector: PWD