Description: Extension of Porch and Roof of Stadium Building at GCOPE Ganderbal Name of Work Extension of Porch and Roof of Stadium Building at GCOPE Ganderbal
Details: Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of :( G.S. Sheet) (Material to be handed over to Intending authority. Dismantling steel work in built up sections in angles, tees, flats andchannels including all gusset plates, bolts, nuts, cutting rivets, welding etc.including dismembering and stacking within 50 meters lead (Material to be handed over to Intending authority. Dismantling wood work in frames, trusses, purlins and rafters upto 10meters span and 5 meters height including stacking the material within 50meters lead : Of sectional area 40 sqcm. and above (Material to be handed over to Intending authority. Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated eart
Sector: Sports