Details: execution of balance construction of 90 mtr span major pmt bridge (harka bahadur bridge) with steel super structure over singo river at km 199.750 on road zozila–kargil-leh balance work for construction of 90 m span major pmt bridge (harkabahadur) with steel superstructure (deck type), over singo river at km 199.75 on road zojila-kargil-lehinleh-ladakh (ut) under project vijayak as per nit drawing and based on hydraulic data, ground data, special condition, particular specification of the tender document including plate load test of superstructure as specified, all preparatory works, & ptfe bearings, steel superstructure (through type) including design, launching/ of staging work if required, wearing coat having non skid surface, seal expansion joints, hand railings, kerbs, crash barrier, guard posts, drainage arrangement over carriage way and footpath, service arrangement for utilities, painting all exposed steel works and kerbs, 1.5m wide footpath both sides, temporary
Sector: Defense