Details: disconnecting the 150 hp centrifugal pump of any make from the motor after disconnection of mechanical tyre coupling, suction/discharge pipe line and unbolting from foundation base plate, loading/unloading of pump pn vehicle and transportation of the pump from naushera e/m installation to workshop as directed by engineer-in-charge for repair/replacement/maintenance of unserviceable parts including opening and dismantling of pump for repair, with necessary oiling and greasing and again transportation of the pump through vehicle from workshop to naushera e/m installations after necessary repair/ replacement/ maintenance and loading/ unloading the pump and re-coupling the pump with motor on base frame, after checking of the alignment with motor, testing, commissioning complete all as directed by engr-in-charge. ( note : spare parts of pump will be measured and paid separately under respective items). s&f in repair of mechanical seal/ gland packing suitable for 150 hp capacity pu
Sector: Defense