Details: barbed wire fencing using angle iron 50% & wooden posts 50% at sulnarge sangreshi (with six strands) earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil 1m from cutting edgefront 700rft full angle posts other sides 50/50(88+131+132) x 0.30mx0.30mx0.45m = 14.21cum soling stones in horizontal including cost of stones ramming and watering the same complete job.219x 0.30m x0.30mx 0.075m = 1.47 providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with 1: 3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)219 x 0.30mx0.30mx0.45m
Sector: Water Resource Department