Description: Up gradation of Construction work of Balance work of Compound Wall around OHT 1 3 4 and 5 Name of Work Up gradation of Construction work of Balance work of Compound Wall around OHT 1 3 4 5 Two No RCC Culvert 4 70 Span on road R11 R12 in Ph II Balance Sign Board on different Feeder Roads Shifting of main hoarding fixed at entry point Repair work of Fixing Chain Link Fencing Sewerage and Drainage Disposal P L G I Pipe at I C Ghatti Kathua
Details: Demolishing lime concrete manually/by mechanical means and disposal of material within 50 meters lead 1:3:6 or richer mix. Dismantling old plaster or shirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. Earthwork in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and bottom ramming and lift upto 1.5 mtr including getting out the excavated earth and disposal of surplus excavated earth within a lead of 50 mtrs from cutting edge: All kinds of soil. Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and bottom ramming and lift upto
Sector: Industry Development