Description: C o P wall drain npar hotel Doodhpathri heights at Dobwan Mujpathri PH ll Name of work C O P WALL DRAIN NPAR HOTEL DOODPATHRI HEIGHTS AT DOBWAN MUJPATHRI PH II
Details: Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed (All Kinds of Soil) Providing and laying of stone soling hand packed including levelling, ramming and carriage. Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 50 mm thick with 20mm nominal size stone aggregate Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete. Centering and shuttering including strutting, propping
Sector: RDPR