Description: Construction of drain around collection sump at Gurtum Naag including making washout arrangements in supply main and construction of collection chamber WSS Krangsoo under Languishing programme Name of Work Construction of Drain arround collection Sump at Gurtum Naag including making Washout arrangements in supply main and construction of Collection chamber WSS Krangsoo under Languishing Advertised Cost Rs 7 62 lacs
Details: Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: a) All Kinds of Soil Dismantling C.I. pipes manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes and lead at site within 50 meter lead as per direction of Engineerin-charge 150mm dia DI pipe Laying in position centrifugally cast (spun) iron S&S or flanged pipes (excluding cost of pipe) Providing push-on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket Providing fabricating of MS bends, tees, tail pieces as per site requirement for making washout arrangements at spot
Sector: Water supply and Sewerage