Description: Refer BOQ Name of Work CONSTT OF Community Sanitary Complex at Anharan Prishmulla U H SBM 2023 24 Pyt Sangna Block Drabshalla
Details: Add CIB Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed inculiding lead lift and carriage Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand Random Rubble masonry with hard stone in superstructure above plinth le
Sector: RDPR