Description: Construction of Lane from H o Gh Nabi Hajam toHajam Mohalla Masjid Sheriff at Wadipora Name of work Construction of Lane from H o Gh Nabi Hajam toHajam Mohalla Masjid Sheriff at Wadipora
Details: Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : Providing and laying of stone soling hand packed complete Job including by MT incl. plum. 0.93 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. Carraige of stone aggregate,mm from Source to Site. 20 KMS lead Carraige of sand from Source to Site. 20 kms lead Carraige of stone soling from Source to Site. 20 kms lead Add provisions for signboard, Photographes and other unforseen items.
Sector: RDPR