Description: Fencing Marriage Hall At Her Seichien Block Shahabad Name of Work Fencing marriage Hall at Her Seichien under CAPEX BUDGET 2023 24 block Shahabad
Details: Earthwork in excavation by manual means in trenches for foundations etc ( exceeding 1.5m in width) and exceeding 10 sqm on plan,depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge,disposed earth to be levelled and neatly dressed providing and laying of stone soling hand packed tightly nallah Providing and laying in position cement concrete of 1:3:6 mix with 20 mm N/S graded stone aggregate including cost of cement but excluding cost of centering and shuttering. plums @20% Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth leve 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars Centering and Shuttering inclu
Sector: RDPR