Description: PROVIDING AND LAYING EARTHEN DRSM CHECK DAMS CONSTRUCTION OF INSPECTION PATH 0 50 Afforestation of rooted saplings in Pits AT BRANWARI KHADINIYAR BARAMULLA CO BARAMULLA C0 1K UNDER CAMPA FY 2023 24 Name of Work PROVIDING AND LAYING EARTHEN DRSM CHECK DAMS CONSTRUCTION OF INSPECTION PATH 0 50 Afforestation of rooted saplings in Pits AT BRANWARI KHADINIYAR BARAMULLA CO BARAMULLA C0 1K UNDER CAMPA FY 2023 24
Details: FOR LAYING OF CRATE WIRE STRUCTURE AT BRANWARI, KHADINIYAR BARAMULLA ,CO:BARAMULLA /C0 1K (UNDER CAMPA FY- 2023-24) Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil 1m from cutting edge1x16’-0”x5’-0”x [6”+ 1’-0”]/2 = 60cft or 1.70cum x 8 = 13.6 Hand-packing stones in wire-crates; excluding cost of crates and stones16’-0”x4’-0”x4’-0’=256cft or 7.25cumDeduct 15% voids = 1.08 T= 6.17 x 8 = 49.36 Carriage of stones average lead of 600 m by head loadQtty vide (3) = 49.36 Supply of crate wire mesh (4”x4”) including carriage up to site of work1x 16’-0”x 16’-0”= 256 sftLids 2x 4’-0”x4’-0”= 16 sft 288sft @ 220gram / sft = 63.36kg x 8 = 506.88 kg LAYI
Sector: Water Resource Department