Description: Gujjar Hostel Talwara in sub div Pouni and creation of 100KVA stn alongwith insertion of 9m ST poles in existing HT line and laying of LT line for stage0 at WSS Ghiyala in sub div Reasi under DC work of JalShakti for JJM on turnkey basis in div Reasi Name of Work Survey Design Supply Transportation Carriage Erection Testing and Commissioning for creation of 250KVA sub station along with erection of 11KV HT line for stages 0 at WSS Talwara including insertion of 9mtr ST poles in existing tap line from Zero morh to Gujjar Hostel Talwara in sub division Pouni and creation of 100KVA sub station along with insertion of 9mtr ST poles in existing HT line and laying of LT line for stage 0 at WSS Ghiyala in sub division Reasi under deposit contribution work of Jal Shakti PHE for Jal Jeevan Mission JJM on turnkey basis in jurisdiction of Electric Division JPDCL Reasi
Details: Laying of 11KV Tapping Point at WSS Talwara ST Pole 9 mtr ST 410 SP33 GI V cross-arm with top Bracket including clamp & GI Channel/Angle Iron including clamps and braces 11KV GO, AB Switch 3-phase, 3-pole 200 Amp, vertical type ACSR Weasel Conductor 11kV Polymeric composite Pin Insulator 12kV, 5kN,Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm 11kV Polymeric composite Disc Insulator 12kV,minfailing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm Galvinized Nuts and Bolts Danger Plates with Clamps Anti-Climbing Device with Clamps Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip (25x3)mm. (for 2 No ST Poles and 1 No GO set) Aluminium Paint of reputed make Cement bottoming 1:2:4 mix as per REC standards 0.5cum /pole Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.
Sector: Power Sector