Description: Extension of outlet channel improvement of drain and other allied works of Batnag Noorpora Awantipora Pulwama Part C Name of Work Extension of outlet channel improvement of drain and other allied works of Batnag Noorpora Pulwama Part C
Details: Extension of outlet channel/ improvement of drain and other allied works of Batnag Noorpora, Pulwama (Part-C) Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift up to 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil 1m from cutting edge.(Drain)= 150’x1’-6”x6”= 112.5cftlawn= (16’-0”x18’-0”) x1’-0”= 288cftPipe= 40’-0’x1’-6”x2’-0”= 120cft Providing and laying soling stone in horizontal including ramming ,watering , including cost of stones complete.Qtty vide (1) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate