Description: Temporary Restoration of Main canal L I S Wasoora from RD 290 to RD 365 Mts by way of laying of Polythene and filled E C Bags Name of Work Temporary Restoration of Main canal L I S Wasoora from RD 290 to RD 365 Mts by way of laying of Polythene and filled E C Bags Amount of work Rs 0 94 lacs
Details: Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : Filling of E/C Bags with earth incld. cost of sewing/strings but excluding cost of E/C Bags. Unloading sand/ earth filled bags from boats placing in dry/ placing of earth filled bags in position. Carriage of earth from nearest source to dumping site of work by Mechanical Transport avg. lead 4 Kms. Carriage of earth from dumping to actual site of work by manual labours avg. lead 300 mts. Cost of E/C Bags. Cost of Polythene.
Sector: Irrigation