Description: Temporary Restoration of Main canal L I S Wasoora from RD 0 to RD 50 Mts by way of laying of Polythene and filled E C Bags Name of Work Temporary Restoration of Main canal L I S Wasoora from RD 0 to RD 50 Mts by way of laying of Polythene and filled E C Bags Amount of work Rs 1 02 lacs
Details: Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : Filling of E/C Bags with earth incld. cost of sewing/strings but excluding cost of E/C Bags. Unloading sand/ earth filled bags from boats placing in dry/ placing of earth filled bags in position. Carriage of earth from nearest source to dumping site of work by Mechanical Transport. Carriage of earth from dumping to actual site of work by manual labours avg. lead 300 mts. Cost of E/C Bags. Cost of Polythene.
Sector: Irrigation