Description: Construction of temporary diversion bund and removal of mulba silt from intake channel and sump of LIS wasoora Name of Work Construction of Temporary Diversion bund and removal of mulba silt from intake channel and sump of L I S Wasoora Amount of work Rs 0 29 lacs
Details: Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : Filling of E/C Bags with earth incld. cost of sewing/strings but excluding cost of E/C Bags. Placing of earth filled bags in position in stream (Wankran Nallah) Cost of E/C Bags. Carriage of earth from nearest site to actual site of work by Mechanical Transport avg. lead 6 Kms. Carriage of E/C Bags from Divisional store (L.S).
Sector: Irrigation