Description: FMBAP Programme for Flood Management of River Jhelum and its tributries Phase II Part A details of works as per SBD Name of Work Restoration of embankment of Veshow Nallah tributary of River Jhelum by way of crates and bank revetment from RD 11000 to 41000 mtrs at spots Resectioning and crates from RD 41001 to 60000 mtrs at spots RCC Retaining wall with Raft on Right side of Veshow Nallah at RD 32000 mtrs at Chearbagh Zangalpora and Dabloo FP work on Sonman Nallah by way of earthen bund S B with toe crates and bank revetment from RD 8000 to 20000 mtrs at spots Construction of FP work on Lidder Nallah by way of bank revetment with toe crates from RD 8000 to 26000 mtrs at spots RD 26001 to 50000 mtrs at spots Erosion control work on Hapatnard Nallah by way of crates from RD 4000 to 10000 mtrs at spots Adwani Nallah by way of crates from RD 6000 to 18000 mtrs Restoration of embankment of Aripath Nallah tributary of River Jhelum by way of toe crates and bank revetment from RD 2000 mtrs to 20000 mtrs at spots RD 23000 to 38000 mtrs at spots and Construction of FP work on Brengi Nallah by way of crates and bank revetment from RD 2000 to 24000 mtrs at spots Amount of Work Rs 1897 80 lacs
Details: Earthwork excavation by Mechnical means hydraulic exvavator) over areas exceeding 30 cm in depth 1.5m in eith as well as 10 sqm on plan including disposal of excavated earth lead utp 50 m and lift upto 1.5 m disposed earth to be leveled and neatly dressed. Extra lift 4- lifts Extra lift 3- lifts Extra lift 2- lifts Extra lift 1- lift Earthwork in excavation by manual means over areas (exceeding 30 cm in depth 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50n meters and lift upto 1.5 m, as directed by Engineer-in Charge in all kinds of soils Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering rolling each layer half tonne roller or wooden or steel rammers and rolling every third and top most layer with power roller of minimum 08 tones and dressing up in embankments for roads, flood bank marginal bank and guide banks for filling up ground depressions lead upto 50mtr and lift upto 1.5 mtr including ramming, wa
Sector: Irrigation