Description: Supply Installation Testing and Commissioning of Electro Mechanical equipments at water supply scheme Nowhar Malpora of Jal Shakti PHE Mechanical Division South Awantipora under JJM Name of Work Supply Installation Testing and Commissioning of Electro Mechanical equipments at water supply scheme Nowhar Malpora of Jal Shakti PHE Mechanical Division South Awantipora underJJM
Details: WSS Nowhar Malapora (Adv. Cost: Rs. 4,74,000/-) De-silting/cleaning of 5000 GPH Tube Settler filtration plant by way of Pre Settling tankDisassembling of the light weight FRP strips/pieces fitted in tongue and groove arrangement from slots of Pre -settling tank by using skilled labour, tools and tackles with utmost care and precautions to avoid damage to.- The dismantled FRP strips have to be shifted to a safer place for its stacking and stacking properly to avoid any fracture or damage of the FRP Strips/pieces and include all head load involved in carrying the job at site.- The FRP strips so dismantled are to be taken one after another and cleaned from both sides using brushes, soap scrubbers and other cleansing agents for removing the crust layer of silt/mud and other foreign bodies accumulated on it to achieve a clean and smooth surface. - The area of the Pre Settling Tank below the slots for fitment of FRP Plates /strips need to be cleared off from the accumulated silt on walls
Sector: Water supply and Sewerage