Description: Removal of mulba/Boulders from supply channel and providing of protection work by way of crate bund to existing diversion bund at off take point of Darkhan Wohan 2nd Canal--Name of Work: Removal of mulba/Boulders from supply channel & providing of protection work by way of crate bund to existing diversion bund at off take point of Darkhan Wohan 2nd Canal. Amount of Work:- Rs 2.82 Lacs
Details: Earthwork Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : Supply of Quarry Stones Hand-packing stones in wire-crates; excluding cost of stones and excluding cost of crates Carriage of Quarry Stones by an avg lead of 11 kms by M.T and 60 mtrs by Head Load supply of 4mm dia B.A wire woven crates with lid /binding wire. (4"x4" mesh) as per ISI specification including all carriages ( manual /Mechanical) up to site of work complete Job
Sector: Irrigation