Description: please read BOQ WORK NO 01 Construction of 01 No 10000 glns GSR 01 No 10000 glns Sump Tank and Boundary Wall in wss Baira 01 No 10000 glns GSR in wss Bakhta under JJM
Details: Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavatedearth as directed:All kinds of soil. Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil. Providing and laying in position cement concrete of 1:4:8 mix (1 cement 4 coarse sand 8 graded stone agg. 40 mm nominal size) excl. cost of centring and shuttering all work up to plinth level (using crushed stone agg.) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work
Sector: Water supply and Sewerage