Description: as per BOQ Name of Work Revamping Stabilisation of dedicated Power Supply System system to MES at 33 11 KV R Stn Sataney Important Note All allied and associated works required for sucessful execution of above items of works including testing and energisation specifically mentioned or not in above description but required at site shall be deemed to be included and covered in the quoted rates
Details: Replacement of obsolete/outdated electrical equipments and also to provide independent system for MES dedicated Power from 33/11 KV R/Stn. Sataney. Suppy, , Testing and Commissioning of 11 kV VCB Panel Board Set (12 kV, 1250A, 25 kA, Indoor) with O/C, E/F relays (IEC61850) (Ashida Make), Mimic Diagram, Voltmeter, Ammeter, Annunciation Windows with annunciation relays, 3-phase Tri-vector smart meter -5 Amps, DLMS Compliant with RS-485 port SCADA Compatible etc MAKE :- Seimens, Megawin, BHEL, Electricfield, Pascal, Stelmec.,etc . with CT ratio of Incomer 600-300/5A and outgoing with CT ratio 200-100/5A (1+3) including dismentaling of existing equpiment including loading and unloading and right back to Division store Udhampur as per the direction of Site Engineer 33 kV, Gapless Surge Arrestor,27 KV ,30 KA ,LA with Polymer housing, Stn. Type heavy duty ISI standards (5 Sets Station type 1 for Power Transformer) 11kV, Gapless Surge Arrestor,9 KV ,10 KA ,LA with Polymer housing, Stn.
Sector: Power Sector